Our Process
From initial survey to verified compliance — a transparent, documented workflow designed for procurement teams and ADA coordinators.
Survey
Comprehensive sidewalk assessment identifying all trip hazards and displacement conditions.
Identify
Document each hazard with measurements, photos, and GPS coordinates in our GIS platform.
Map & Report
Generate prioritized remediation plans with cost estimates and compliance timelines.
Cut
Patented slicing removes hazards with precise 1:12 ADA slopes — same-day mobilization available.
Verify
Post-remediation slope verification and compliance documentation for your records.
Patented Concrete Slicing
PCC's patented method precisely cuts displaced sidewalk panels to create smooth, permanent 1:12 ADA slopes. Unlike grinding — which removes surface material without achieving true compliance — or full replacement — which is costly and disruptive — slicing delivers measurable results in hours.
- Same-day mobilization for urgent compliance needs
- Minimal pedestrian and traffic disruption
- Verified slope measurements on every cut
Method Comparison
Institutional buyers evaluate multiple remediation approaches. Here is how patented slicing compares to common alternatives.
| Criteria | Patented Slicing | Grinding | Full Replacement |
|---|---|---|---|
| cost | Low | Low–Medium | High |
| time | Hours | Hours | Weeks |
| compliance | True 1:12 ADA slopes | Often fails inspection | Compliant when done correctly |
| disruption | Minimal | Minimal | Major |
| waste | None | Dust/debris | Significant |
| durability | Permanent | Temporary | Permanent |